BHPBILLITON – CANNINGTON MINE

Shaft Winder As Built Project

2009 – Convert hard copy drawings to CAD.

Winder maintenance team were utilising hard copy drawings from project handover. To ensure best practices TechCompServices was engaged to transfer the hard copy information to AutoCAD, utilising site drafting standards and upload the resultant drawings to the site electronic drawing management system.